change order

change order

 英

  • 網(wǎng)絡(luò)變更通知單;工程變更通知單;變更單

英漢解釋

n.

例句

The site section of the BOM can be modified through a revision change or an SCO (site change order) .

BOM站點(diǎn)內(nèi)容可以編輯版本更改時(shí)或者一個(gè)站點(diǎn)變更

Take the construction change order as the basis of final account for completed project and the time limit delay.

工程變更作為竣工結(jié)算順延工期根據(jù)

In charge of the implementation of ECOs (engineering change order) in the plant. Maintain technology document and BOM in WINCHILL system.

負(fù)責(zé)工程更改通知執(zhí)行系統(tǒng)維護(hù)技術(shù)文件材料清單

If there is a change order during the construction period, the change order shall adopt the unit rate price of the contract.

如果基建期間工程變更通知這個(gè)變更通知應(yīng)該采取合同單價(jià)價(jià)格

A copy of the change order is kept in the hotel safe until funds are received.

更改順序副本保存酒店安全直到收到資金

The presented scenario shows collaboration in the context of engineering change order.

視頻展示工程變更情景協(xié)作

Identify the potential change and create a potential change order file.

確認(rèn)潛在變化創(chuàng)建一個(gè)針對(duì)潛在變化順序文件

Step 2. Identify the potential change and create a potential change order file.

確定可能變更項(xiàng)可能變更文件

Change order of images on flash banner. Same images as now.

更改影像順序閃光旗幟現(xiàn)在一樣圖像

Schedule impact assessment to Change Order.

對(duì)變更進(jìn)度評(píng)估

Proposing Frequency Changes in a Change Order Recommendation Report

根據(jù)推薦更改順序規(guī)劃頻率更改

Form of Change Order Procedures

變更指令程序格式

Requirement Change Order and Authorization

制度要求變化順序認(rèn)可

Submit claim report of change order to client immediately, review change order proposal from subcontractors;

及時(shí)業(yè)主提交變更索賠以及審核分包變更報(bào)價(jià)

CAD ECO Engineering Change Order

工程更改

A Sufficient Condition for the Iterated Limits to Change Order of Lim its

累次極限一個(gè)充分條件